Close Menu

    Subscribe to Updates

    Get the latest creative news from infofortech

    What's Hot

    Alaska Air sustainability director lays out strategy for low-carbon flying at Climate Week NYC – GeekWire

    September 24, 2026

    Containment is dead: Five takeaways from the AI ROI in Contact Center Summit

    September 23, 2026

    How to Use AI Agents to Fact-Check and Copy Edit Your Content

    September 23, 2026
    Facebook X (Twitter) Instagram
    InfoForTech
    • Home
    • Latest in Tech
    • Artificial Intelligence
    • Cybersecurity
    • Innovation
    Facebook X (Twitter) Instagram
    InfoForTech
    Home»Latest in Tech»NASA completes a smooth rehearsal for historic Artemis 2 moon launch
    Latest in Tech

    NASA completes a smooth rehearsal for historic Artemis 2 moon launch

    InfoForTechBy InfoForTechFebruary 20, 2026No Comments3 Mins Read
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
    NASA completes a smooth rehearsal for historic Artemis 2 moon launch
    Share
    Facebook Twitter LinkedIn Pinterest Telegram Email


    NASA’s Space Launch System rocket stands on its Florida launch pad. (NASA Photo / Aubrey Gemignani)

    NASA counted down to T-minus 29 seconds tonight during a rehearsal for a historic launch that could send astronauts around the moon for the first time in more than half a century.

    The run-through at Launch Complex 39B, at Kennedy Space Center in Florida, was known as a wet dress rehearsal because it involved filling up the propellant tanks on NASA’s Space Launch System — a 322-foot-tall rocket that made its debut during 2022’s uncrewed Artemis 1 mission.

    The only major component that was missing at the launch pad was the crew. NASA astronaut Reid Wiseman, the commander for the Artemis 2 mission, said in a posting to X that he was watching the proceedings from Launch Control.

    Once NASA reviews the results of the two-day rehearsal, mission managers will decide whether to green-light the Artemis 2 crew’s 10-day trip around the moon and back. NASA says liftoff could come as early as March 6.

    This week’s simulated countdown provides an opportunity for NASA to check out the Space Launch System rocket, the Orion crew capsule and ground support systems in advance of the actual launch.

    An initial rehearsal on Feb. 2 was stopped at roughly T-minus 5 minutes due to a liquid hydrogen leak. Engineers made repairs at the pad to clear the way for a replay of the rehearsal.

    NASA had to pause this evening’s first countdown in its final minutes to deal with what it called a “booster avionics system voltage anomaly,” but the count resumed and proceeded as planned to T-minus 33 seconds. At that point the countdown was automatically paused and recycled to T-minus 10 minutes.

    It took more than an hour to reconfigure the rocket’s fueling system for another terminal count. Then NASA’s launch team went through an even smoother second countdown, reached a scheduled stopping point at T-minus 29 seconds, and then concluded the rehearsal. A news briefing about the test is set for 11 a.m. ET (8 a.m. PT) on Friday.

    The four crew members for Artemis 2 are expected to go into quarantine as soon as this week after almost three years of training. In addition to Wiseman, the crew includes NASA astronauts Christina Koch and Victor Glover, plus Canadian astronaut Jeremy Hansen.

    Artemis 2’s flight plan calls for sending the astronauts on a figure-8 route around the moon and back. The trip will take them as far as 4,600 miles beyond the far side of the moon — farther out than any human has gone before.

    Although Artemis 2 will be historic in its own right, the mission’s main purpose is to prepare the way for Artemis 3, which aims to land humans on the lunar surface for the first time since Apollo 17 in 1972. That mission is officially set for no earlier than mid-2027, but industry experts expect the schedule to slip.

    Several companies headquartered in the Seattle area have a significant interest in the Artemis moon program. A facility in Redmond operated by L3Harris (previously known as Aerojet Rocketdyne) builds thrusters for the Orion spacecraft — and Jeff Bezos’ Blue Origin space venture, based in Kent, is developing a Blue Moon lander that’s meant to put Artemis crews on the lunar surface starting in 2030. Blue Origin’s New Glenn rocket is expected to send an uncrewed cargo version of its lander to the moon sometime in the next few months.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    InfoForTech
    • Website

    Related Posts

    Alaska Air sustainability director lays out strategy for low-carbon flying at Climate Week NYC – GeekWire

    September 24, 2026

    The military wants AI that rarely tells it no

    September 23, 2026

    Apple Links Landmarks On Its Maps App To Hidden Histories Podcast Episodes

    September 23, 2026

    These 3 Major Upgrades Could Be Heading to Your Next Flagship Android Phone

    September 23, 2026

    There are 40K attractive jobs available in Singapore. MOM data reveals where they are.

    September 22, 2026

    Who owns the customer relationship when an agent does the buying? – GeekWire

    September 22, 2026
    Leave A Reply Cancel Reply

    Advertisement
    Top Posts

    A Billionaire-Backed Startup Wants to Grow ‘Organ Sacks’ to Replace Animal Testing

    March 23, 2026379 Views

    DoJ Disrupts 3 Million-Device IoT Botnets Behind Record 31.4 Tbps Global DDoS Attacks

    March 20, 202641 Views

    Mayiduo spent S$1M to produce his movie. It broke even & that’s a win in S’pore.

    March 31, 202634 Views

    How is Luckin Coffee expanding rapidly in S’pore while keeping its coffee so cheap?

    April 23, 202622 Views
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Advertisement
    About Us
    About Us

    Our mission is to deliver clear, reliable, and up-to-date information about the technologies shaping the modern world. We focus on breaking down complex topics into easy-to-understand insights for professionals, enthusiasts, and everyday readers alike.

    We're accepting new partnerships right now.

    Facebook X (Twitter) YouTube
    Most Popular

    A Billionaire-Backed Startup Wants to Grow ‘Organ Sacks’ to Replace Animal Testing

    March 23, 2026379 Views

    DoJ Disrupts 3 Million-Device IoT Botnets Behind Record 31.4 Tbps Global DDoS Attacks

    March 20, 202641 Views

    Mayiduo spent S$1M to produce his movie. It broke even & that’s a win in S’pore.

    March 31, 202634 Views
    Categories
    • Artificial Intelligence
    • Cybersecurity
    • Innovation
    • Latest in Tech
    © 2026 All Rights Reserved InfoForTech.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.